POWER GRID INTELLIGENCE · ACROSS 7 US RTOs

The data-center, nuclear, and gigafactory power buildouts that matter.

When a hyperscaler, nuclear developer, or frontier-tech manufacturer plans a major US buildout, they file a public interconnection request with their regional grid operator — often 18–36 months before the press release. We track the most significant filings across all 7 US RTOs — PJM, MISO, ERCOT, CAISO, SPP, NYISO, ISO-NE — in three categories: AI hyperscalers, advanced nuclear, and frontier-tech manufacturing. Below is a hand-curated set of the largest active projects, refreshed periodically from public filings and reporting.

Total Queue
MW across all filings
AI Hyperscalers
data center builds by OpenAI/Meta/AWS/Google/xAI et al.
Advanced Reactors
SMR / microreactor queue entries — all sizes
Tracked Matches
queue entries tied to companies in the ROS database

Geographic distribution

SMR / Nuclear
AI Hyperscaler
Large Load
Standard
Filtered to

Circle size = total MW in the queue for that state. Click a state to filter the table below.

Filter: Source: · Updated
Customer / Project RTO Size Fuel / Tech Location Target Online Priority
Loading interconnection queue data…

State PUC dockets

Pre-FERC large-load filings · TX / CA / AZ / NV / OH / WY / ID

Loading state PUC dockets…

Queue breakdown

MW in the queue, by RTO and by fuel type

By Regional Transmission Organization

By fuel / tech type